top of page
Intertek
The project at Intertek, Manchester was initially quoted in June 2015 and was completed in May 2016. This project was a great opportunity for us to showcase a more bespoke finish on a job with the support work being a mix of metalwork and fixed plinth. This gave us scope to cover both aspects of our fixed and mobile systems as it left the end user with the chance to have a ore fitted workstation in one area of their work and the flexibility of our H frame system with Trespa TopLab Base worktops in the main lab and HTM63 Profile worktops in a fitted and fixed style in the other area.
May 2016
Manchester
£15,000
Project Gallery
bottom of page