Ladybridge High School, Bolton
Ladybridge high school in Bolton contacted us directly back in February 2019. Their brief was to design 2 new food technology rooms, a science laboratory and ICT Suite.Lab UK worked alongside the school and the council to design all new furniture to suit each environment. Furniture in the 2 food technology rooms contained a variety of units to enable the school to have the storage they need whilst having the end benches with knee space to enable students to have a place to work. We also manufactured the oven housing units and supplied the services such as the sinks, taps and sockets. In the science room, Ladybridge wanted service pods to include 4-way gas taps and sockets. We installed this furniture in November 2019.
February 2019
Bolton
£71,000