top of page

Promotional Videos

Check out some examples of our past work.

Medtec to Market, Wirral

​

Installed September 2021

Recent job designed, manufactured and installed by us. Installation December 2020.

Work completed at Lady Bridge High School in Bolton. This video takes a look at the educational furniture we installed in the food technology room. Below is the 3D visual of the projected works for the whole project as a comparison.

Work completed in September 2019 at the University of St Andrews in Scotland. This is short video of a couple of the rooms fitted with university laboratory furniture.

A video to show the projected works at Lady bridge High School in Bolton. This job is due to be completed November 2019.

A 3D walk round a research lab designed by ourselves at C Tech. 

A 3D walk around of a sample lab a member of the team designed. 

bottom of page